Use case

Can dry ice clean a conveyor belt during allergen change-over?

Yes — allergen change-overs validated via swab study, integrated into HACCP.

Verdict

Yes

Validated via swab study; integrated into HACCP plan.

The detailed answer

Allergen change-overs are validated through swab studies during the trial cycle. Dry ice physically removes residual allergen from belt surfaces, support rollers, transfer points and ancillary equipment. ATP and ELISA swabs return at or below specification consistently. The per-clean record integrates with batch records. Trial validation typically 4-8 cycles before procedure goes live. Reduces change-over time from 12-14 hours (chemical) to 4 hours (dry ice).

Get a free quote in 60 seconds.

Tell us what you need cleaned. We come back with a fixed quote within 24 hours — and an exact estimate range while you wait.

Or talk to us directly

development